Previous jobs


Britannia

Telic Engineering represented MTU to perform a task at the Britannia platform owned and operated by Harbour Energy, offshore Aberdeen, UK. Britannia is in the North Sea approximately 210 kilometers north east of Aberdeen and is is one of the largest natural gas and condensate fields in the North Sea. […]


CNOOC Scott Platform

Telic Engineering has leading expertise in the field of gasturbine-generator instrumentation and control maintenance, and has been entrusted by our client MTU Maintenance to represent them during semi-annual inspections at the CNOOC Scott Platform. Our engineer conducted in-depth inspections of the LM5000 gas turbine-generator package, meticulously documenting the results of […]


Britannia

Telic Engineering was hired by MTU Maintenance to provide expertise to Harbour Energy at the Britannia platform, offshore Aberdeen, UK. One of their gas export compressor gas turbines had an issue with the gas fuel control valve. With support from Woodward, Telic Engineering performed troubleshooting that resulted in replacing parts […]


OMIFCO, Oman

Telic Engineering performed a project received from Woodward Saudi-Arabia to support the Factory Acceptance Testing, and commissioning of two steam turbine compressor control upgrades at OMIFCO in Sur, Oman. Oman India Fertilizer Company (OMIFCO) is an initiative by the Government of Oman, and the republic of India, and operates a […]


A-Site, Al-Shaheen field

Telic Engineering received a request to support our client Turner Engine Control Solutions (TECS) to visit A-Site platform, offshore Doha, Qatar, for troubleshooting a Cummins emergency diesel generator governor, EPG electronic control instabilities. This task was considered critical considering that emergency power is the back-up power for the Al-Shaheen field […]


CNOOC Buzzard Platform

Telic Engineering received an assignment to represent MTU Power for the instrumentation and control tasks during an annually, or 8000 running hours, preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, LM2500+ SAC G4 PGT25 gasturbine-generator packages on board, […]


Triton FPSO

Telic Engineering performed an assignment received from Oilfield Solutions (OFS) to represent and support them with regards to control and instrumentation during a LM6000 exchange and 4000 hour service inspections offshore Aberdeen, UK, onboard the Triton FPSO operated by Dana Petroleum.


Coral FLNG, South Korea

Telic Engineering received an assignment from Woodward Inc. to represent them for commissioning tasks of the liquid fuel system supplied to Baker Hughes, and installed on the Coral FLNG located at the Samsung Heavy Industries Shipyard in Geoje, South Korea. Baker Hughes supplied, installed and starts-up four gasturbine generator units, […]