Daily Archives: April 30, 2018


Agbami – FPSO II

Telic Engineering received another assignment on board the Agbami FPSO located offshore Nigeria to support a 8000 hour preventative maintenance service on one of their LM2500+ SAC gasturbine-compressors. Specifically the tasks consisted of water washing the turbine, verifying the control, protection, instrumentation, valves, and calibrating the geometry. Additional the mechanic […]