Prelude FLNG II


Telic Engineering returned to the Prelude FLNG to represent Woodward Japan for commissioning of 5009FT Steam Turbine controls, ProTech-GII Overspeed Protection Devices, and TM25LP Actuators supplied to Mitsubishi Corporation and installed on board the Shell FLNG Prelude.

This assignment was a continuation of the previous visit to support the solo run in which the steam turbine is decoupled from the compressor and during which the overall functionality and over-speed protection is verified.