Glen Lyon – FPSO

Telic Engineering was contracted by our client to supply services on the newly build FPSO (Floating Production, Storage and Offloading) from BP (British Petroleum). Specific tasks were the installation and verification of hydraulic starter clutch speed probes used for hydraulic starter over-speed protection in the four LM2500 gasturbine-generators on board. […]


Nexen Scott – II

Represented my client for a second trip to Nexen Scott as the control engineer delivering support during the 8000 hours service for the Unit A LM5000 that is used as the gasturbine-generator on the offshore Nexen Scott platform in the North Sea UK sector. This support resulted in safety and […]


Nexen Scott – I

Represented my client as the control engineer delivering start-up support following the exchange of a LM5000 power turbine that is used as the Unit B gasturbine-generator on the offshore Nexen Scott platform in the North Sea UK sector. This support resulted in several adjustments made in the control, identifying a number […]


Season’s Greetings

As the holiday season is upon us, we find ourselves reflecting on the past year and those who have helped to shape my business. It has been quite a year for me. I hope that 2016 has been just as memorable for you, your colleagues and your loved ones and I […]


Saudi Electricity Company – Tabuk – II

  Telic Engineering supported by representing our customer with finalizing warranty items for the Saudi Electricity Company projects consisting of mobile gasturbine – generator units installed and commissioned in Tabuk, Saudi Arabia. These units consists of General Electric LM2500 plus gasturbines packaged on two trailers primarily consisting of a local […]


Saudi Electricity Company – Tabuk / Duba – I

Telic Engineering supported by representing our customer with finalizing punch list items for the Saudi Electricity Company projects consisting of mobile gasturbine – generator units installed and commissioned in Tabuk and Duba, Saudi Arabia. These units consists of General Electric LM2500 plus gasturbines packaged on two trailers primarily consisting of […]


Offshore Britannia – III

Performed a third assignment representing the client for control and instrumentation support during a 8000 hour inspection and start-up of the ‘B’ gas export compressor – LM5000 Gasturbine, located at the offshore Britannia platform in the UK.


Offshore Britannia – II

        Returned to the platform for a second time to represent the client for start-up support of the ‘A’ gas export compressor – LM5000 Gasturbine, located at the offshore Britannia platform in the UK.  


Offshore Britannia – I

Represented the client for start-up support of the ‘A’ gas export compressor – LM5000 gasturbine located at the offshore Britannia platform in the UK.


4-Hour Lockout Avoidance

Representing our client for implementing and verifying new functionality to avoid 4 hour lockout on 2x TM2500 units for the SEC II project located in Tabuk, Saudi-Arabia. This upgrade solution mitigates the 4-hour lockout period required on LM2500 and LM6000 packages after a hot shutdown when the unit is not […]