CNOOC


CNOOC Buzzard Platform

Telic Engineering received an assignment to represent MTU Power for the instrumentation and control tasks during an annually, or 8000 running hours, preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, LM2500+ SAC G4 PGT25 gasturbine-generator packages on board, […]


Buzzard Platform

Telic Engineering performed an assignment to represent MTU Power performing preventative maintenance and inspections. This consisted of a 4000 hour inspection of a LM2500 plus G4 Gasturbine-Generator drive package including auxiliaries such as the hydraulic starter skid. The location was at the CNOOC Buzzard platform, offshore Aberdeen, UK. The result […]


Buzzard / Golden Eagle

Telic Engineering received a request from client MTU Power to represent them and support two rotations of each three weeks duration offshore at the Buzzard and Golden Eagle platform operated by their customer CNOOC. This occurred during the Covid-19 crisis developments and risks were mitigated by being tested prior to […]


CNOOC Buzzard Platform III

Telic Engineering received another assignment to represent MTU Power for the instrumentation and control tasks during an annually or so called 8000 running hours preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, GT-A, LM2500+ SAC G4 […]


CNOOC Buzzard Platform II

Telic Engineering received an assignment to represent MTU Power for the instrumentation and control tasks during an annually or so called 8000 running hours preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, GT-C, LM2500+ SAC G4 […]