Electricity


Annual Inspection, Brae Alpha Platform   Recently updated !

Telic Engineering completed an assignment for Woodward, representing their client Baker Hughes at TAQA Brae Alpha platform, located offshore Aberdeen, UK. The primary task involved conducting an annual inspection focused on the instrumentation and control systems of the LM2500+ G4 SAC gasturbine generator package. This comprehensive inspection is vital for […]


Preventative Maintenance on Gasturbines at FPSO

In the oil, gas, and energy industry, collaborations between companies like Woodward, Baker Hughes, and Dana Petroleum are pivotal. These alliances become especially vital when dealing with complex machinery such as gasturbines. But what is a gasturbine in simple terms? A gasturbine, fundamentally, is an engine that converts natural gas […]


Millcreek – Control Upgrade

Telic Engineering Ltd was subcontracted and represented our client during an upgrade at Millcreek Power Station located in St. George, Utah, US. Specifically the hardware was upgraded from a NetCon to a MicroNet Plus control system which interfaces with the existing field devices and on-engine hardware that provide core fuel […]


Agbami – FPSO I

Telic Engineering received an assignment to convert and functional verify going from single fuel to dual fuel operation for three LM2500+ SAC gasturbine-generators on board the Agbami FPSO located offshore Nigeria. Specifically the tasks consisted of replacing single fuel nozzles with dual fuel nozzles, install primary and secondary liquid fuel […]


Spinetta Marengo

Provided services as commissioning manager during an installation and commissioning of a new GE LM2500 DLE gasturbine-generator package located at Solvay Specialty Polymers, Spinetta Marengo, Italy. The responsibilities included: Ensure environmental, health and safety (EHS) commitments are maintained. Organizing daily meetings with the site team, and the end user. Identify […]


Zappalorto – Argentina

Telic Engineering Ltd received an assignment to represent NRG Australia as the commissioning engineer for the start-up of four GE TM2500+ gen 7 units installed by APR Energy in Zappalorto, Argentina. The four units combined produce over 100 MW of electricity for the Argentinian utility grid. Specifically the responsibilities comprised […]


Glen Lyon – FPSO

Telic Engineering was contracted by our client to supply services on the newly build FPSO (Floating Production, Storage and Offloading) from BP (British Petroleum). Specific tasks were the installation and verification of hydraulic starter clutch speed probes used for hydraulic starter over-speed protection in the four LM2500 gasturbine-generators on board. […]


Nexen Scott – II

Represented my client for a second trip to Nexen Scott as the control engineer delivering support during the 8000 hours service for the Unit A LM5000 that is used as the gasturbine-generator on the offshore Nexen Scott platform in the North Sea UK sector. This support resulted in safety and […]


Nexen Scott – I

Represented my client as the control engineer delivering start-up support following the exchange of a LM5000 power turbine that is used as the Unit B gasturbine-generator on the offshore Nexen Scott platform in the North Sea UK sector. This support resulted in several adjustments made in the control, identifying a number […]


Saudi Electricity Company – Tabuk – II

  Telic Engineering supported by representing our customer with finalizing warranty items for the Saudi Electricity Company projects consisting of mobile gasturbine – generator units installed and commissioned in Tabuk, Saudi Arabia. These units consists of General Electric LM2500 plus gasturbines packaged on two trailers primarily consisting of a local […]