Gasturbine


CNOOC Buzzard Platform

Telic Engineering received an assignment to represent MTU Power for the instrumentation and control tasks during an annually, or 8000 running hours, preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, LM2500+ SAC G4 PGT25 gasturbine-generator packages on board, […]


Coral FLNG, South Korea

Telic Engineering received an assignment from Woodward Inc. to represent them for commissioning tasks of the liquid fuel system supplied to Baker Hughes, and installed on the Coral FLNG located at the Samsung Heavy Industries Shipyard in Geoje, South Korea. Baker Hughes supplied, installed and starts-up four gasturbine generator units, […]


Nexen Buzzard Platform I

Telic Engineering Ltd was subcontracted to represent our client during a 4000 hour preventative maintenance inspection of the GT-B LM2500 plus SAC G4 gasturbine, package, and auxiliary systems on board of the Buzzard platform, offshore UK, and operated by Nexen. This included supporting mechanical and instrumental inspection activities for which […]


Britannia Platform

Telic Engineering Ltd received an assignment to represent MTU Power as their control and instrumentation engineer to support the start-up of a GE LM5000 gasturbine-compressor following a 4000 hour preventative maintenance service on board the ConocoPhillips Britannia platform located offshore, UK. The tasks consisted of monitoring the control system for proper sequencing, […]


Agbami – FPSO II

Telic Engineering received another assignment on board the Agbami FPSO located offshore Nigeria to support a 8000 hour preventative maintenance service on one of their LM2500+ SAC gasturbine-compressors. Specifically the tasks consisted of water washing the turbine, verifying the control, protection, instrumentation, valves, and calibrating the geometry. Additional the mechanic […]


Millcreek – Control Upgrade

Telic Engineering Ltd was subcontracted and represented our client during an upgrade at Millcreek Power Station located in St. George, Utah, US. Specifically the hardware was upgraded from a NetCon to a MicroNet Plus control system which interfaces with the existing field devices and on-engine hardware that provide core fuel […]


Agbami – FPSO I

Telic Engineering received an assignment to convert and functional verify going from single fuel to dual fuel operation for three LM2500+ SAC gasturbine-generators on board the Agbami FPSO located offshore Nigeria. Specifically the tasks consisted of replacing single fuel nozzles with dual fuel nozzles, install primary and secondary liquid fuel […]