GE


Britannia

Telic Engineering represented MTU to perform a task at the Britannia platform owned and operated by Harbour Energy, offshore Aberdeen, UK. Britannia is in the North Sea approximately 210 kilometers north east of Aberdeen and is is one of the largest natural gas and condensate fields in the North Sea. […]


CNOOC Buzzard Platform

Telic Engineering received an assignment to represent MTU Power for the instrumentation and control tasks during an annually, or 8000 running hours, preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, LM2500+ SAC G4 PGT25 gasturbine-generator packages on board, […]


Coral FLNG, South Korea

Telic Engineering received an assignment from Woodward Inc. to represent them for commissioning tasks of the liquid fuel system supplied to Baker Hughes, and installed on the Coral FLNG located at the Samsung Heavy Industries Shipyard in Geoje, South Korea. Baker Hughes supplied, installed and starts-up four gasturbine generator units, […]


Kassel, Germany

Telic Engineering Ltd received an assignment from MTU Maintenance Berlin-Brandenburg GmbH to support them on their retrofit project at the combined cycle power plant (HKW) in Kassel, Germany. MTU Maintenance Berlin-Brandenburg GmbH is one of the leading maintenance providers for GE’s LM™ series of aeroderivative industrial gas turbines worldwide. MTU […]


Buzzard Platform

Telic Engineering performed an assignment to represent MTU Power performing preventative maintenance and inspections. This consisted of a 4000 hour inspection of a LM2500 plus G4 Gasturbine-Generator drive package including auxiliaries such as the hydraulic starter skid. The location was at the CNOOC Buzzard platform, offshore Aberdeen, UK. The result […]


Chrysaor – Britannia Platform

Telic Engineering received an assignment to represent MTU Power for start-up support of a GE LM5000 Gasturbine, offshore Aberdeen, UK, at the Britannia platform operated by Chrysaor. Established in 2007, Chrysaor is the UK’s leading independent North Sea oil and gas group and operates assets that provide two-thirds of the […]


Buzzard / Golden Eagle

Telic Engineering received a request from client MTU Power to represent them and support two rotations of each three weeks duration offshore at the Buzzard and Golden Eagle platform operated by their customer CNOOC. This occurred during the Covid-19 crisis developments and risks were mitigated by being tested prior to […]


Bridge Power Project – Ghana

Telic Engineering received prior to the Covid-19 crisis an assignment from Pro-Per Energy Services to support GE Power with commissioning activities as a control and instrumentation engineer for five TM2500 generation 8 units, consisting of LM2500+ G4 SAC gasturbines and auxiliaries. These are installed as part of the Bridge Power […]


Sabah Electricity (SESB) – Tawau

Telic Engineering was assigned, prior to Covid-19 crisis, to support Mechanical Field Support B.V. and their customer Sabah Electricity (SESB) located in Tawau, Malaysia. Sabah Electricity Sdn. Bhd. (SESB) is an electrical company that generates, transmits and distributes electricity mainly in Sabah and Federal Territory of Labuan, Malaysia. It supplies […]


CNOOC Buzzard Platform III

Telic Engineering received another assignment to represent MTU Power for the instrumentation and control tasks during an annually or so called 8000 running hours preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, GT-A, LM2500+ SAC G4 […]