General Electric


CNOOC Buzzard Platform

Telic Engineering received an assignment to represent MTU Power for the instrumentation and control tasks during an annually, or 8000 running hours, preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, LM2500+ SAC G4 PGT25 gasturbine-generator packages on board, […]


Buzzard Platform

Telic Engineering performed an assignment to represent MTU Power performing preventative maintenance and inspections. This consisted of a 4000 hour inspection of a LM2500 plus G4 Gasturbine-Generator drive package including auxiliaries such as the hydraulic starter skid. The location was at the CNOOC Buzzard platform, offshore Aberdeen, UK. The result […]


Chrysaor – Britannia Platform

Telic Engineering received an assignment to represent MTU Power for start-up support of a GE LM5000 Gasturbine, offshore Aberdeen, UK, at the Britannia platform operated by Chrysaor. Established in 2007, Chrysaor is the UK’s leading independent North Sea oil and gas group and operates assets that provide two-thirds of the […]


Bridge Power Project – Ghana

Telic Engineering received prior to the Covid-19 crisis an assignment from Pro-Per Energy Services to support GE Power with commissioning activities as a control and instrumentation engineer for five TM2500 generation 8 units, consisting of LM2500+ G4 SAC gasturbines and auxiliaries. These are installed as part of the Bridge Power […]


CNOOC Buzzard Platform III

Telic Engineering received another assignment to represent MTU Power for the instrumentation and control tasks during an annually or so called 8000 running hours preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, GT-A, LM2500+ SAC G4 […]


CNOOC Buzzard Platform II

Telic Engineering received an assignment to represent MTU Power for the instrumentation and control tasks during an annually or so called 8000 running hours preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, GT-C, LM2500+ SAC G4 […]


Alvheim – FPSO II

Telic Engineering received a second assignment from Woodward Netherlands to support their client Baker Hughes, a GE company, to do control panel wire checks for one of the two turbines used for power generation on board the Alvheim FPSO operated by Aker BP located offshore Norway. Similar checks have been […]


Alvheim – FPSO I

Telic Engineering received an assignment from Woodward Netherlands to support their client Baker Hughes, a GE company, with troubleshooting concerning regular communication errors with I/O devices. This impacted the reliability of one of the two turbines used for power generation on board the Alvheim FPSO operated by Aker BP located […]


Britannia Platform

Telic Engineering Ltd received an assignment to represent MTU Power as their control and instrumentation engineer to support the start-up of a GE LM5000 gasturbine-compressor following a 4000 hour preventative maintenance service on board the ConocoPhillips Britannia platform located offshore, UK. The tasks consisted of monitoring the control system for proper sequencing, […]


Millcreek – Control Upgrade

Telic Engineering Ltd was subcontracted and represented our client during an upgrade at Millcreek Power Station located in St. George, Utah, US. Specifically the hardware was upgraded from a NetCon to a MicroNet Plus control system which interfaces with the existing field devices and on-engine hardware that provide core fuel […]