LM2500 plus


Buzzard / Golden Eagle

Telic Engineering received a request from client MTU Power to represent them and support two rotations of each three weeks duration offshore at the Buzzard and Golden Eagle platform operated by their customer CNOOC. This occurred during the Covid-19 crisis developments and risks were mitigated by being tested prior to […]


CNOOC Buzzard Platform III

Telic Engineering received another assignment to represent MTU Power for the instrumentation and control tasks during an annually or so called 8000 running hours preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, GT-A, LM2500+ SAC G4 […]


CNOOC Buzzard Platform II

Telic Engineering received an assignment to represent MTU Power for the instrumentation and control tasks during an annually or so called 8000 running hours preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, GT-C, LM2500+ SAC G4 […]


Nexen Buzzard Platform I

Telic Engineering Ltd was subcontracted to represent our client during a 4000 hour preventative maintenance inspection of the GT-B LM2500 plus SAC G4 gasturbine, package, and auxiliary systems on board of the Buzzard platform, offshore UK, and operated by Nexen. This included supporting mechanical and instrumental inspection activities for which […]