Maintenance


CNOOC Buzzard Platform

Telic Engineering received an assignment to represent MTU Power for the instrumentation and control tasks during an annually, or 8000 running hours, preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, LM2500+ SAC G4 PGT25 gasturbine-generator packages on board, […]


Triton FPSO

Telic Engineering performed an assignment received from Oilfield Solutions (OFS) to represent and support them with regards to control and instrumentation during a LM6000 exchange and 4000 hour service inspections offshore Aberdeen, UK, onboard the Triton FPSO operated by Dana Petroleum.


Buzzard Platform

Telic Engineering performed an assignment to represent MTU Power performing preventative maintenance and inspections. This consisted of a 4000 hour inspection of a LM2500 plus G4 Gasturbine-Generator drive package including auxiliaries such as the hydraulic starter skid. The location was at the CNOOC Buzzard platform, offshore Aberdeen, UK. The result […]


Buzzard / Golden Eagle

Telic Engineering received a request from client MTU Power to represent them and support two rotations of each three weeks duration offshore at the Buzzard and Golden Eagle platform operated by their customer CNOOC. This occurred during the Covid-19 crisis developments and risks were mitigated by being tested prior to […]


CNOOC Buzzard Platform III

Telic Engineering received another assignment to represent MTU Power for the instrumentation and control tasks during an annually or so called 8000 running hours preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, GT-A, LM2500+ SAC G4 […]


CNOOC Buzzard Platform II

Telic Engineering received an assignment to represent MTU Power for the instrumentation and control tasks during an annually or so called 8000 running hours preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, GT-C, LM2500+ SAC G4 […]


Nexen Buzzard Platform I

Telic Engineering Ltd was subcontracted to represent our client during a 4000 hour preventative maintenance inspection of the GT-B LM2500 plus SAC G4 gasturbine, package, and auxiliary systems on board of the Buzzard platform, offshore UK, and operated by Nexen. This included supporting mechanical and instrumental inspection activities for which […]


Agbami – FPSO II

Telic Engineering received another assignment on board the Agbami FPSO located offshore Nigeria to support a 8000 hour preventative maintenance service on one of their LM2500+ SAC gasturbine-compressors. Specifically the tasks consisted of water washing the turbine, verifying the control, protection, instrumentation, valves, and calibrating the geometry. Additional the mechanic […]


Glen Lyon – FPSO

Telic Engineering was contracted by our client to supply services on the newly build FPSO (Floating Production, Storage and Offloading) from BP (British Petroleum). Specific tasks were the installation and verification of hydraulic starter clutch speed probes used for hydraulic starter over-speed protection in the four LM2500 gasturbine-generators on board. […]