MicroNet


SASREF Refinery

Telic Engineering was subcontracted to represent Turner Engine Control Solutions (TECS) at SASREF Refinery located in Jubail City, Saudi-Arabia. The task comprised of start-up support and tuning of a Woodward MicroNet TMR steam turbine control system. This task was completed such that SASREF was able to return the steam turbine […]


Jazan Refinery

Telic Engineering received an assignment to represent Woodward Inc. to support their customer Honeywell for closing outstanding Site Acceptance Test (SAT) items at the Jazan Refinery project in Saudi Arabia. Woodward supplies the Compressor Control System (CCS) as part of the automated systems that Honeywell supplies. During this period visited […]


Britannia Platform

Telic Engineering Ltd received an assignment to represent MTU Power as their control and instrumentation engineer to support the start-up of a GE LM5000 gasturbine-compressor following a 4000 hour preventative maintenance service on board the ConocoPhillips Britannia platform located offshore, UK. The tasks consisted of monitoring the control system for proper sequencing, […]


Millcreek – Control Upgrade

Telic Engineering Ltd was subcontracted and represented our client during an upgrade at Millcreek Power Station located in St. George, Utah, US. Specifically the hardware was upgraded from a NetCon to a MicroNet Plus control system which interfaces with the existing field devices and on-engine hardware that provide core fuel […]


Zappalorto – Argentina

Telic Engineering Ltd received an assignment to represent NRG Australia as the commissioning engineer for the start-up of four GE TM2500+ gen 7 units installed by APR Energy in Zappalorto, Argentina. The four units combined produce over 100 MW of electricity for the Argentinian utility grid. Specifically the responsibilities comprised […]


Glen Lyon – FPSO

Telic Engineering was contracted by our client to supply services on the newly build FPSO (Floating Production, Storage and Offloading) from BP (British Petroleum). Specific tasks were the installation and verification of hydraulic starter clutch speed probes used for hydraulic starter over-speed protection in the four LM2500 gasturbine-generators on board. […]


Nexen Scott – II

Represented my client for a second trip to Nexen Scott as the control engineer delivering support during the 8000 hours service for the Unit A LM5000 that is used as the gasturbine-generator on the offshore Nexen Scott platform in the North Sea UK sector. This support resulted in safety and […]


Nexen Scott – I

Represented my client as the control engineer delivering start-up support following the exchange of a LM5000 power turbine that is used as the Unit B gasturbine-generator on the offshore Nexen Scott platform in the North Sea UK sector. This support resulted in several adjustments made in the control, identifying a number […]


Offshore Britannia – III

Performed a third assignment representing the client for control and instrumentation support during a 8000 hour inspection and start-up of the ‘B’ gas export compressor – LM5000 Gasturbine, located at the offshore Britannia platform in the UK.


Offshore Britannia – II

        Returned to the platform for a second time to represent the client for start-up support of the ‘A’ gas export compressor – LM5000 Gasturbine, located at the offshore Britannia platform in the UK.