MTU


Agbami FPSO

Telic Engineering received a request from MTU Power to support their customer Chevron with an issue on board the Agbami FPSO, offshore in the Gulf of Guinea. Two out of three GE LM2500+ dual fuel gasturbine-generators on board, that are critical for supplying electrical power, failed to start on gas […]


CNOOC Buzzard Platform III

Telic Engineering received another assignment to represent MTU Power for the instrumentation and control tasks during an annually or so called 8000 running hours preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, GT-A, LM2500+ SAC G4 […]


CNOOC Buzzard Platform II

Telic Engineering received an assignment to represent MTU Power for the instrumentation and control tasks during an annually or so called 8000 running hours preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, GT-C, LM2500+ SAC G4 […]


Nexen Buzzard Platform I

Telic Engineering Ltd was subcontracted to represent our client during a 4000 hour preventative maintenance inspection of the GT-B LM2500 plus SAC G4 gasturbine, package, and auxiliary systems on board of the Buzzard platform, offshore UK, and operated by Nexen. This included supporting mechanical and instrumental inspection activities for which […]


Britannia Platform

Telic Engineering Ltd received an assignment to represent MTU Power as their control and instrumentation engineer to support the start-up of a GE LM5000 gasturbine-compressor following a 4000 hour preventative maintenance service on board the ConocoPhillips Britannia platform located offshore, UK. The tasks consisted of monitoring the control system for proper sequencing, […]


Agbami – FPSO II

Telic Engineering received another assignment on board the Agbami FPSO located offshore Nigeria to support a 8000 hour preventative maintenance service on one of their LM2500+ SAC gasturbine-compressors. Specifically the tasks consisted of water washing the turbine, verifying the control, protection, instrumentation, valves, and calibrating the geometry. Additional the mechanic […]


Glen Lyon – FPSO

Telic Engineering was contracted by our client to supply services on the newly build FPSO (Floating Production, Storage and Offloading) from BP (British Petroleum). Specific tasks were the installation and verification of hydraulic starter clutch speed probes used for hydraulic starter over-speed protection in the four LM2500 gasturbine-generators on board. […]


Nexen Scott – II

Represented my client for a second trip to Nexen Scott as the control engineer delivering support during the 8000 hours service for the Unit A LM5000 that is used as the gasturbine-generator on the offshore Nexen Scott platform in the North Sea UK sector. This support resulted in safety and […]


Nexen Scott – I

Represented my client as the control engineer delivering start-up support following the exchange of a LM5000 power turbine that is used as the Unit B gasturbine-generator on the offshore Nexen Scott platform in the North Sea UK sector. This support resulted in several adjustments made in the control, identifying a number […]


Offshore Britannia – III

Performed a third assignment representing the client for control and instrumentation support during a 8000 hour inspection and start-up of the ‘B’ gas export compressor – LM5000 Gasturbine, located at the offshore Britannia platform in the UK.