North Sea


Buzzard / Golden Eagle

Telic Engineering received a request from client MTU Power to represent them and support two rotations of each three weeks duration offshore at the Buzzard and Golden Eagle platform operated by their customer CNOOC. This occurred during the Covid-19 crisis developments and risks were mitigated by being tested prior to […]


Britannia Platform

Telic Engineering Ltd received an assignment to represent MTU Power as their control and instrumentation engineer to support the start-up of a GE LM5000 gasturbine-compressor following a 4000 hour preventative maintenance service on board the ConocoPhillips Britannia platform located offshore, UK. The tasks consisted of monitoring the control system for proper sequencing, […]


Nexen Scott – II

Represented my client for a second trip to Nexen Scott as the control engineer delivering support during the 8000 hours service for the Unit A LM5000 that is used as the gasturbine-generator on the offshore Nexen Scott platform in the North Sea UK sector. This support resulted in safety and […]


Nexen Scott – I

Represented my client as the control engineer delivering start-up support following the exchange of a LM5000 power turbine that is used as the Unit B gasturbine-generator on the offshore Nexen Scott platform in the North Sea UK sector. This support resulted in several adjustments made in the control, identifying a number […]


Offshore Britannia – III

Performed a third assignment representing the client for control and instrumentation support during a 8000 hour inspection and start-up of the ‘B’ gas export compressor – LM5000 Gasturbine, located at the offshore Britannia platform in the UK.


Offshore Britannia – II

        Returned to the platform for a second time to represent the client for start-up support of the ‘A’ gas export compressor – LM5000 Gasturbine, located at the offshore Britannia platform in the UK.  


Troll C – III

Represented my client to support troubleshooting the start-up on diesel and fuel transfers from gas to diesel of a main power generating gas turbine at Troll C. Troll C is an offshore floating process and accommodation platform with a steel hull located in Norway and operated by Statoil.   Source  


HelWin beta – III

Contributed to the customer achieving commissioning completion of the fire and gas system installed at the HelWin beta platform. The HelWin beta platform has been built for electricity grid operator TenneT by the Heerema Fabrication Group. It will bring 690 Megawatt clean energy to land; HelWin2 project is one of the […]


HelWin beta – II

Second trip to support commissioning activities related to the fire and gas system at the HelWin beta platform.   The HelWin beta platform will be built for electricity grid operator TenneT by the Heerema Fabrication Group. It will bring 690 Megawatt clean energy to land; HelWin2 project is one of […]