PGT25


CNOOC Buzzard Platform

Telic Engineering received an assignment to represent MTU Power for the instrumentation and control tasks during an annually, or 8000 running hours, preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, LM2500+ SAC G4 PGT25 gasturbine-generator packages on board, […]


Coral FLNG, South Korea

Telic Engineering received an assignment from Woodward Inc. to represent them for commissioning tasks of the liquid fuel system supplied to Baker Hughes, and installed on the Coral FLNG located at the Samsung Heavy Industries Shipyard in Geoje, South Korea. Baker Hughes supplied, installed and starts-up four gasturbine generator units, […]


CNOOC Buzzard Platform III

Telic Engineering received another assignment to represent MTU Power for the instrumentation and control tasks during an annually or so called 8000 running hours preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, GT-A, LM2500+ SAC G4 […]


CNOOC Buzzard Platform II

Telic Engineering received an assignment to represent MTU Power for the instrumentation and control tasks during an annually or so called 8000 running hours preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, GT-C, LM2500+ SAC G4 […]