Turner Engine Control Solutions


A-Site, Al-Shaheen field

Telic Engineering received a request to support our client Turner Engine Control Solutions (TECS) to visit A-Site platform, offshore Doha, Qatar, for troubleshooting a Cummins emergency diesel generator governor, EPG electronic control instabilities. This task was considered critical considering that emergency power is the back-up power for the Al-Shaheen field […]


Bapco Refinery

Telic Engineering Ltd represented Turner ECS for commissioning and configuration of a Woodward Peak200 Steam Turbine governor controlling the speed for a new installed Elliott-Ebara Steam Turbine Pump located at Bapco Refinery in Bahrain. The Peak200 is: Field Configurable Integrated graphical operator control panel Simple to install, configure & operate […]


Saipem 3000

Representing the client at the Saipem 3000 vessel and tested six diesel-generator governors while in dry dock using load banks. Performed load steps, isochronous and droop mode load sharing tests. Assisted with troubleshooting interface signals, tuned dynamics, and adjusted synchronizers.   The Saipem 3000 is a self propelled DP crane […]