Britannia

Telic Engineering was hired by MTU Maintenance to provide expertise to Harbour Energy at the Britannia platform, offshore Aberdeen, UK. One of their gas export compressor gas turbines had an issue with the gas fuel control valve. With support from Woodward, Telic Engineering performed troubleshooting that resulted in replacing parts […]


OMIFCO, Oman

Telic Engineering performed a project received from Woodward Saudi-Arabia to support the Factory Acceptance Testing, and commissioning of two steam turbine compressor control upgrades at OMIFCO in Sur, Oman. Oman India Fertilizer Company (OMIFCO) is an initiative by the Government of Oman, and the republic of India, and operates a […]


CNOOC Scott Platform

Telic Engineering received an assignment from the client to support the start-up of a LM5000 gasturbine generator after a power turbine exchange, and to monitor the other operational LM5000 gasturbine generator. This was performed at CNOOC Scott Platform, offshore Aberdeen, UK during the Christmas holiday season and into the new […]


Happy Christmas

As this year is close to completion it is time to show our gratitude to our clients for the opportunities to support your company business. Most of all I am wishing you, your family, and colleagues a wonderful Christmas, and all the best for the year 2022.


A-Site, Al-Shaheen field

Telic Engineering received a request to support our client Turner Engine Control Solutions (TECS) to visit A-Site platform, offshore Doha, Qatar, for troubleshooting a Cummins emergency diesel generator governor, EPG electronic control instabilities. This task was considered critical considering that emergency power is the back-up power for the Al-Shaheen field […]


CNOOC Buzzard Platform

Telic Engineering received an assignment to represent MTU Power for the instrumentation and control tasks during an annually, or 8000 running hours, preventative maintenance service checks at the CNOOC Buzzard platform located offshore Aberdeen, Scotland. These checks are performed on one of their three, LM2500+ SAC G4 PGT25 gasturbine-generator packages on board, […]


Triton FPSO

Telic Engineering performed an assignment received from Oilfield Solutions (OFS) to represent and support them with regards to control and instrumentation during a LM6000 exchange and 4000 hour service inspections offshore Aberdeen, UK, onboard the Triton FPSO operated by Dana Petroleum.


Coral FLNG, South Korea

Telic Engineering received an assignment from Woodward Inc. to represent them for commissioning tasks of the liquid fuel system supplied to Baker Hughes, and installed on the Coral FLNG located at the Samsung Heavy Industries Shipyard in Geoje, South Korea. Baker Hughes supplied, installed and starts-up four gasturbine generator units, […]


Scott Platform

Telic Engineering received an assignment to represent our client MTU and support the start-up of a LM5000 GT following a GG exchange. This was performed offshore Aberdeen, UK, at the CNOOC Scott Platform.